
MCAVOY / KS 224
PROJECT SUMMARY
SCOPE OF WORKS
PAL Contractors has significant experience working within the education sector, so we were thrilled to collaborate with our valued client, McAvoy Group.
The project brief was to provide and install eco-friendly, durable, and visually impressive suspended ceilings, all while adhering to a strict budget. Although we worked with standard products and systems, we were committed to delivering a sleek and contemporary finish that exceeded expectations.
Our scope of work includes the supply and installation of 600x600mm Rockfon Blanka Db41-A24 Class A edge ceiling tiles, mounted on a Chicago Metallic T24 A exposed clipped system grid. Additionally, we have supplied and installed an MF suspended ceiling, consisting of two layers of 12.5mm GTEC Fireline Board, finished with tape and jointing.
Kelmscott School
Walthamstow, London
PROJECT OVERVIEW
Client: McAvoy Group
Duration: 4 Weeks
Project Summary: MF Plasterboard Ceilings, Tape and Joint, Suspended Ceilings,